Posted by Brett Bishop on March 7, 2016

WORK SESSION (March 5th, 2016)

This Saturday the team was hard at work with the tear down of last seasons car. Work began on removing the brakes and pedal assembly from the tube frame chassis, which will be rebuilt and reused for this years vehicle. The timing chain, cams, and lifters were removed to gain access to the engines head

Posted by Brett Bishop on February 21, 2016

WORK SESSION (February 20th, 2016)

Hey everyone, yesterday the team was hard at work once again to get through various components of our 2016 build. Welding continued on our chassis and more of our cartesian tubes were set into place and tacked. We would like to thank Sheldon again for all of the grinding and welding that was done this weekend

Posted by Brett Bishop on February 14, 2016

WORK SESSION (February 13th, 2016)

Hey everyone, the team has had another very productive work session and got a head start on the chassis build yesterday morning. We got to work with setting, leveling, and tacking together our cartesian tubes for this years chassis. While we were also able to finish the final preparation, sanding, and finishing of our foam molds that

Posted by Brett Bishop on February 7, 2016

WORK SESSION (February 6th, 2016)

A huge thank you to everyone who took time out of their Saturday morning to help with yesterdays work session! Yesterday we recycled an impact attenuator from last years car to be used in impact testing. The team also got to work on our foam molds once more on sanding and applying Bondo on our foam molds.

Posted by Brett Bishop on January 31, 2016

WORK SESSION ( January 30th, 2016)

The team had their hands full today as we made our way through multiple tasks. Our jig tubes were sized and finished to be used in the welding and build of the chassis. Also, our chassis tubes were prepped and stripped of their protective coating which allowed us to get a start in the welding