Month: March 2019

March 26, 2019 UAlberta FSAE

Fabrication and Design In preparation for full welding, the chassis was cut out of the jig and engine mounts were tacked into place. This is a large step toward having a completed car, as it means final tabs are being installed and components are being completed. The car will be welded by Epic Metal Services…