WORK SESSION ( January 30th, 2016)

The team had their hands full today as we made our way through multiple tasks. Our jig tubes were sized and finished to be used in the welding and build of the chassis. Also, our chassis tubes were prepped and stripped of their protective coating which allowed us to get a start in the welding of our tube frame chassis. Finally, the team was hard at work in finishing the forming, cutting, and sanding of our foam molds to be later used in vacuum forming. Thank you to everyone who volunteered their time and allowed for the team to have a productive work session. We hope to see you all again soon!